Utilities & Internet in Japan: The Complete Setup Guide
When you move into a place in Japan, electricity, gas, water and internet are four separate contracts — no single counter handles them all. This guide orders them from slowest to fastest, and covers how to apply, how long each takes, whether you need to be home, and how to close everything when you move out.
📅 Verified in September 2026
📋 At a glance: how the four get switched on
| Service | How to apply | Roughly how long | Need to be home? |
| Electricity | Apply online or by phone to a power company for "use start" | Same day to a few days | Usually no |
| Gas | Book an opening appointment by phone or online | By appointment, often days after move-in | Yes (開栓立ち会い) |
| Water | File a "start of use" notice with your municipal water bureau | A few days | Usually no |
| Internet | Apply to a provider; some setups need on-site work | Fibre: 2 weeks to 1 month+ | On installation day |
* The above is typical. Procedures and lead times differ a lot between companies and municipalities — always follow what your provider and your local authority specify.
⚠️ Sort out internet first — don't wait until you've moved
Fibre commonly takes 2 weeks to over a month from application to a working connection, and longer in peak season. It's the slowest of the four, so apply the moment your new address is confirmed. In the meantime, tether to your phone or use a plug-in home router that needs no installation.
⚡ Electricity: usually the fastest, but don't skip the name change
- How to apply: before or on move-in day, submit a "start of use" application to a power company. Online or by phone both work.
- The step people miss: if someone lived there before, the power is already on — but the account is still in their name. Without a name change (名義変更) you are effectively using someone else's contract.
- What to have ready: address, start date, your name and contact details. New contracts usually also need a payment method (card or bank direct debit).
- Amperage (契約容量): studios are often 20–30A; households with many appliances 30A or 40A. Too low and running a microwave and a kettle at once can trip the breaker. You can change it when applying or later — available tiers depend on the power company.
- You can choose your supplier: retail electricity was fully deregulated in 2016, and gas and telecom companies sell power too. Switching doesn't change the wiring or cause an outage. Compare the total of standing charge plus usage rate, not just the unit price.
🔥 Gas: the only one that needs an appointment and you at home
On move-in the gas valve is shut off. A technician from the gas company must come and open it (開栓), and they will only light it and check for leaks with you present. Of the four services, this is the one you cannot avoid doing face to face.
- Book early: call as soon as your move-in date is fixed. In peak moving season, slots can be a week out.
- Be home on the day: the technician confirms the valve position and does the ignition check. You need to be there (立会い).
- Duration: usually 30 minutes to an hour.
- You'll get paperwork: emergency contact details, and how to read your meter and check monthly usage.
- When booking, give your address, move-in date and preferred time window, plus your customer number if you have one.
- Don't turn the valve yourself before the appointment, and don't move or modify gas equipment on your own.
- Detached houses and some apartments use LP (propane) gas, handled by a local supplier. The process is similar but the company is different — find out which type your home uses first.
💧 Water: in most areas, just a start-of-use notice
- How to apply: file a "start of use" notice with your municipal water bureau. Online, by phone or by postcard.
- You usually don't wait at home: the bureau operates the valve from outside. Occasionally they may need to confirm the meter location.
- Timing: switched on within a few days of applying. If you need water urgently, phone and say so.
- How it's billed: standing charge (by pipe diameter) plus usage charge plus a sewerage charge. Water and sewerage are usually metered and billed together every two months.
- Check one thing first: in some apartments part of the water charge is included in the management fee, or the account sits in the landlord's name. Ask before signing anything so you don't end up paying twice.
🌐 Internet: the slowest of the four, and the easiest to get wrong
| Option | Installation | Roughly how long | Best for |
| Fibre (光回線) | Required (some buildings exempt) | 2 weeks to 1 month+ | Long-term stays, remote work, many devices |
| Home router (ホームルーター) | None — plug in and go | A few days to a week | Short stays, no waiting, one person |
| Phone tethering / mobile Wi-Fi | None | Same day to a few days | Stopgap, light usage |
📌 In an apartment, check the wiring type first
Optical wiring, VDSL and in-building LAN each decide whether a technician must visit and how fast a plan you can get. The quickest check is whether there's an LAN socket in the room — or just ask the building manager.
📌 Drilling may need the landlord's consent
Wall drilling and running cable need permission from the landlord or management company, and some buildings require someone present during the work. Raise this when you sign the lease.
📌 "Free installation" usually comes with a contract term
Cheap-looking plans often carry a fixed term (縛り) with a cancellation fee. Read the term length and cancellation conditions before you sign.
💳 Paying: set up a card first, add direct debit later
- Credit card: usually selectable when applying online and effective immediately — the easiest option right after you arrive.
- Bank direct debit (口座振替): the least hassle long term, but you need a Japanese bank account and must submit a debit form with your passbook or cash card. It commonly takes about a month to take effect, and you'll receive paper payment slips in the meantime.
- Payment slips (払込票): pay at a convenience store. Miss one and you'll incur a late fee, which can also affect future phone contracts and rental screenings.
- Suggested order: open all four with a credit card, then migrate to direct debit once your bank account is settled.
🧾 Moving out: all four need a stop and a start
- Electricity, gas, water and internet each need separate closing at the old address and opening at the new one. Nothing transfers automatically. Electricity and internet can be handled as a transfer (移転) with the same company.
- Gas must be re-opened at the new address, again with someone present.
- Most companies want the closing notice several days in advance — don't leave it to moving day.
- Your final bill is usually prorated to the day you left, so it may be higher or lower than a normal month. That's expected.
❓ Common questions
Will I have power and water on move-in day?
Power is usually already on, but you must complete the name change or the account isn't yours. Water normally starts being billed to you once your start-of-use notice is filed, typically within a few days. Gas definitely won't be on — you need the booked visit.
What if no gas appointment is available?
Ask the gas company for their earliest slot and explain that you've just moved in. Bridge the gap with electric appliances (kettle, induction hob, microwave) and use a sento or a gym for showers. Never open the valve yourself.
What do I do while the internet isn't connected yet?
Get a plug-in home router — usually delivered within days and working immediately — then cancel it once fibre is live, but watch its contract term so you don't pay a penalty. If your phone plan has enough data, tethering can cover a few weeks.
Can I choose my own electricity and gas supplier?
Yes. Retail electricity was deregulated in 2016 and city gas in 2017. Switching doesn't change the equipment — the grid, safety inspections and emergency repairs stay the same. Compare the total of standing charge plus usage rate, not just the unit price.
Official reference: Agency for Natural Resources and Energy ↗
Next steps
Renting in Japan
Finding a place, signing, and what to do after you move in — including what to check about utilities and wiring
Read guide →
Bank account & SIM cards
Direct debit needs a Japanese bank account, and a SIM is your backup connection during the wait
Read guide →