← Back to home

Utilities & Internet in Japan: The Complete Setup Guide

Illustration for the Japan utilities and internet setup guide: four cards for electricity, gas, water and internet

When you move into a place in Japan, electricity, gas, water and internet are four separate contracts — no single counter handles them all. This guide orders them from slowest to fastest, and covers how to apply, how long each takes, whether you need to be home, and how to close everything when you move out.

📅 Verified in September 2026

📋 At a glance: how the four get switched on

ServiceHow to applyRoughly how longNeed to be home?
ElectricityApply online or by phone to a power company for "use start"Same day to a few daysUsually no
GasBook an opening appointment by phone or onlineBy appointment, often days after move-inYes (開栓立ち会い)
WaterFile a "start of use" notice with your municipal water bureauA few daysUsually no
InternetApply to a provider; some setups need on-site workFibre: 2 weeks to 1 month+On installation day

* The above is typical. Procedures and lead times differ a lot between companies and municipalities — always follow what your provider and your local authority specify.

⚠️ Sort out internet first — don't wait until you've moved

Fibre commonly takes 2 weeks to over a month from application to a working connection, and longer in peak season. It's the slowest of the four, so apply the moment your new address is confirmed. In the meantime, tether to your phone or use a plug-in home router that needs no installation.

⚡ Electricity: usually the fastest, but don't skip the name change

🔥 Gas: the only one that needs an appointment and you at home

On move-in the gas valve is shut off. A technician from the gas company must come and open it (開栓), and they will only light it and check for leaks with you present. Of the four services, this is the one you cannot avoid doing face to face.

  1. Book early: call as soon as your move-in date is fixed. In peak moving season, slots can be a week out.
  2. Be home on the day: the technician confirms the valve position and does the ignition check. You need to be there (立会い).
  3. Duration: usually 30 minutes to an hour.
  4. You'll get paperwork: emergency contact details, and how to read your meter and check monthly usage.

🔧 While you're here: Renting in Japan

When you sign a lease you should already ask about the power company, the gas type (city gas or propane) and the building's internet wiring — our renting guide lists what to check

Read the renting guide →

💧 Water: in most areas, just a start-of-use notice

🌐 Internet: the slowest of the four, and the easiest to get wrong

OptionInstallationRoughly how longBest for
Fibre (光回線)Required (some buildings exempt)2 weeks to 1 month+Long-term stays, remote work, many devices
Home router (ホームルーター)None — plug in and goA few days to a weekShort stays, no waiting, one person
Phone tethering / mobile Wi-FiNoneSame day to a few daysStopgap, light usage

📌 In an apartment, check the wiring type first

Optical wiring, VDSL and in-building LAN each decide whether a technician must visit and how fast a plan you can get. The quickest check is whether there's an LAN socket in the room — or just ask the building manager.

📌 Drilling may need the landlord's consent

Wall drilling and running cable need permission from the landlord or management company, and some buildings require someone present during the work. Raise this when you sign the lease.

📌 "Free installation" usually comes with a contract term

Cheap-looking plans often carry a fixed term (縛り) with a cancellation fee. Read the term length and cancellation conditions before you sign.

💳 Paying: set up a card first, add direct debit later

🧾 Moving out: all four need a stop and a start

❓ Common questions

Will I have power and water on move-in day?

Power is usually already on, but you must complete the name change or the account isn't yours. Water normally starts being billed to you once your start-of-use notice is filed, typically within a few days. Gas definitely won't be on — you need the booked visit.

What if no gas appointment is available?

Ask the gas company for their earliest slot and explain that you've just moved in. Bridge the gap with electric appliances (kettle, induction hob, microwave) and use a sento or a gym for showers. Never open the valve yourself.

What do I do while the internet isn't connected yet?

Get a plug-in home router — usually delivered within days and working immediately — then cancel it once fibre is live, but watch its contract term so you don't pay a penalty. If your phone plan has enough data, tethering can cover a few weeks.

Can I choose my own electricity and gas supplier?

Yes. Retail electricity was deregulated in 2016 and city gas in 2017. Switching doesn't change the equipment — the grid, safety inspections and emergency repairs stay the same. Compare the total of standing charge plus usage rate, not just the unit price.

Official reference: Agency for Natural Resources and Energy ↗

Next steps

Renting in Japan

Finding a place, signing, and what to do after you move in — including what to check about utilities and wiring

Read guide →

Bank account & SIM cards

Direct debit needs a Japanese bank account, and a SIM is your backup connection during the wait

Read guide →